Chapter 3: Installation--Power Up Test
3 - 4
Figure 3 - 2
Rear Panel of the Interface 1000
Power Up Test
Before you make any other connections to your Interface 1000, check that the Interface 1000 is at least
nominally functional.
After connecting DC power to the Interface 1000, turn on the
Power
switch on the front panel of the Interface
1000 (see Figure 3 - 1).
Watch the
Power
LED as the Interface 1000 powers up. It flashes slowly four or five times (depending on the
amount of software loading), then glows a steady blue. This process could take as long as 15 seconds. The
Interface 1000 fan runs at low speed once the
Power
light stops flashing. If you do not see four or five blinks
and then a steady blue color, see Appendix D for a table of blink codes.
The status of the other LED indicators is not important at this time.
USB
Power In
Power
LED
Power
button
Summary of Contents for Interface 1000
Page 8: ......
Page 18: ......
Page 36: ...Chapter 4 Cell Connections Membrane Cell Connections 4 4...
Page 44: ...Chapter 5 Panel Indicators and Connectors Rear Panel 5 8...
Page 62: ...Chapter 8 Measurement of Small Signals Floating Operation 8 8...
Page 68: ...Appendix A Interface 1000 Specifications Floating Operation Appendix A 6...
Page 70: ...Appendix B Interface 1000 Cell Connector Floating Operation Appendix B 2...
Page 78: ...Appendix E CE Certificate Appendix E 2 Low Voltage Certificate of Conformance...
Page 79: ...Appendix E CE Certificate Appendix E 3 RFI Certificate of Conformance...
Page 80: ...Appendix E CE Certificate Appendix E 4...
Page 84: ...Appendix F Heat in Interface 1000 MultEchem Systems Appendix F 4...