Commissioning
The Fronius IG Plus has been pre-configured at the factory and is ready
to use.
You can assign individual numbers as per ‘The Setup Menu’ section in this
manual.
Factory Confi-
guration
Once the Fronius IG Plus has been connected to the solar modules (DC)
and the public grid (AC), turn the main switch to position - 1 -.
NOTE
Regardless of whether bolts or fuses are used, do not
operate the Fronius IG Plus without fuse covers.
Commissio-
ning
-
If the solar modules are supplying enough power, the Operating Sta-
tus LED will light up orange. The startup phase will be shown on the
display. When the LED lights up orange, this indicates that the Fronius
IG Plus is about to start up automatically.
-
Once the Fronius IG Plus has completed its automatic startup, the
LED will be green.
-
Provided that power continues to feed into the grid, the LED will re-
main green to confirm that the Fronius IG Plus is functioning correctly.
1
off
on
1
2
ON
Summary of Contents for Fronius IG Plus 100
Page 2: ......
Page 4: ...ud_fr_st_et_01382 012008...
Page 14: ...6...
Page 15: ...7 General Information...
Page 16: ...8...
Page 20: ...12...
Page 21: ...13 Installation and Startup...
Page 22: ...14...
Page 71: ...63 Closing Fronius IG Plus Closing Froni us IG Plus 1 1 4 2 7 3 5 6...
Page 77: ...69 Operation...
Page 78: ...70...
Page 118: ...110...
Page 119: ...111 Troubleshooting and Maintenance...
Page 120: ...112...
Page 141: ...133 Appendix...
Page 142: ...134...
Page 152: ...144...
Page 155: ......