31
Important
!
-
Set the jumper from the ‘SM
ON
’ position to the ‘SM
OFF
’ position for
correct measurement results
-
Check the polarity and voltage of the solar module strings: the voltage
should be a max. of 600 V, the difference between the individual solar
module strings should be a max. of 10 V.
Ungrounded
System: Con-
necting Solar
Module
Strings
(continued)
Important
-
When connecting solar module strings, you should use metal bolts or
string fuses with fuse covers in the fuse holder depending on the solar
module manufacturer instructions.
The metal bolts are included in the Fronius IG Plus scope of delivery.
-
Place metal bolts with fuse covers in the fuse holders for unoccupied
DC+ terminals.
8
1
3
2
SM
OFF
7
max. 600 V
SM
ON
5
6
3
1
2
SM
ON
SM
OFF
CAUTION!
Danger of damaging the inverter by overload.
-
Only connect a maximum of 20 A to an individual DC termi-
nal.
-
Connect the DC+ and DC- cables to the correct DC+ and
DC- terminals on the inverter.
Tightening torque 1.2 - 1.5 Nm
Summary of Contents for Fronius IG Plus 100
Page 2: ......
Page 4: ...ud_fr_st_et_01382 012008...
Page 14: ...6...
Page 15: ...7 General Information...
Page 16: ...8...
Page 20: ...12...
Page 21: ...13 Installation and Startup...
Page 22: ...14...
Page 71: ...63 Closing Fronius IG Plus Closing Froni us IG Plus 1 1 4 2 7 3 5 6...
Page 77: ...69 Operation...
Page 78: ...70...
Page 118: ...110...
Page 119: ...111 Troubleshooting and Maintenance...
Page 120: ...112...
Page 141: ...133 Appendix...
Page 142: ...134...
Page 152: ...144...
Page 155: ......