59
Solar Module
Ground at
Positive Pole:
Connecting
Solar Module
Strings with a
Cable Cross
Section > 16
mm²
(continued)
Important!
When using connection distributors (copper plate), insert 6
metal bolts with fuse covers in the fuse holder.
The metal bolts are included in the Fronius IG Plus scope of delivery.
14
1
3
2
15
2
1
Important
-
Set the jumper from the ‘SM
ON
’ position to the ‘SM
OFF
’ position for
correct measurement results
-
Check the polarity and voltage of the DC cable: the voltage should
be a max. of 600 V.
13
max. 600 V
Summary of Contents for Fronius IG Plus 100
Page 2: ......
Page 4: ...ud_fr_st_et_01382 012008...
Page 14: ...6...
Page 15: ...7 General Information...
Page 16: ...8...
Page 20: ...12...
Page 21: ...13 Installation and Startup...
Page 22: ...14...
Page 71: ...63 Closing Fronius IG Plus Closing Froni us IG Plus 1 1 4 2 7 3 5 6...
Page 77: ...69 Operation...
Page 78: ...70...
Page 118: ...110...
Page 119: ...111 Troubleshooting and Maintenance...
Page 120: ...112...
Page 141: ...133 Appendix...
Page 142: ...134...
Page 152: ...144...
Page 155: ......