Procedure for opening the Fronius IG Plus for service or maintenance:
1. Disconnect the AC and DC sides from the inverter
2. Open the connection area
3. Turn off DC main switch
4. Remove plate covers
5. Allow the capacitors to discharge (5 minutes)
6. If present, remove the fuse for the solar module ground
7. If present, remove string fuses
8. Disconnect DC cable
9. Disconnect AC cable
1
4
1
2
3
*)
Fronius recommends a fuse with 1
A and a dimension of 10 x 38 mm
for solar module grounding.
*) Plastic bolts are included in the
Fronius IG Plus scope of delive-
ry.
Inserting the fuse will ground the
solar module at the positive pole.
Solar Module
Ground: Inser-
ting Fuses
(continued)
Summary of Contents for Fronius IG Plus 100
Page 2: ......
Page 4: ...ud_fr_st_et_01382 012008...
Page 14: ...6...
Page 15: ...7 General Information...
Page 16: ...8...
Page 20: ...12...
Page 21: ...13 Installation and Startup...
Page 22: ...14...
Page 71: ...63 Closing Fronius IG Plus Closing Froni us IG Plus 1 1 4 2 7 3 5 6...
Page 77: ...69 Operation...
Page 78: ...70...
Page 118: ...110...
Page 119: ...111 Troubleshooting and Maintenance...
Page 120: ...112...
Page 141: ...133 Appendix...
Page 142: ...134...
Page 152: ...144...
Page 155: ......