Table of contents
Qualification of assembly staff
Personal protective equipment for assembly staff
Qualification of operating staff
Protective equipment for operating staff
Requirements at the installation site
Information about the fuel store
Assembling the articulated arm rotary agitator
Assembling the gears and feeder trough
Mounting the fibre shredder (optional)
Fitting the upper part of gravity shaft and drive unit
Fitting adjustable feet in boiler room (optional)
Temperature monitoring device in the fuel store (TMD):
Connecting the sprinkler system
Table of contents
2
Fröling Ges.m.b.H. | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com