4.3.6 Fitting adjustable feet in boiler room (optional)
If the closed duct in the boiler room exceeds 2m, an additional support is
recommended:
Ø 15 mm
❒
Remove the brackets from the supporting post
❒
Remove the screws of the trough flange at the relevant position
❒
Secure the brackets to the trough flange with the previously removed screws
❒
Position the supporting post at the bracket and screw together
Screwing the adjustable feet to the floor:
❒
Make two holes each in the floor on the left and right for the adjustable feet
❒
Drill the holes marked
- Drill diameter 15 mm
- Min. drill depth 105 mm
❒
Insert the heavy load anchors into the bore holes and tighten with a spanner (AF
17 mm)
4.3.7 Closing the wall penetration
❒
Pack the space in the wall penetration with a non-flammable insulating material
➥
The partition must be insulated to conform with ÖNORM B 3836 or DIN
4102-11!
❒
Close the wall penetration on the store side and the boiler room side with a non-
flammable covering
NOTICE
Do not connect the transfer channel to the brickwork (with concrete), as this
will transfer sound through all the brickwork.
Assembly
4
Assembling the articulated arm rotary agitator
Installation and Operating Instructions GAR 110 / 150 | M2060120_en