Version 2.6:190307-Eng
29
12. PROJECT
With the system it’s also possible to keep track of how much time has been spent on certain
projects. Time spent on projects will appear in the “Project” report.
Adding new projects
This is how you add a new project:
1.
Go to the menu “Edit” and select “Project”.
2.
Click the “Add” (+) button.
3.
Name your project and add a description. Normally type should be “Assignment time”.
4.
Click “OK”, to save.