73
PB
R-410A SEALED SYSTEM REPAIR
Pumping Down
Lo
Closed
Purge the air
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
2-Way
valve
CLOSE
3-Way
valve
– Remove the valve stem caps and confirm that the valve stems
are in the raised position.
– Be sure to use a hexagonal wrench to operate the valve stems.
– Connect the charge hose with the push pin to the service port.
– Open the low-pressure valve on the charge set slightly to air
purge from the charge hose.
– Do this quickly so that the gauge ends up indicating 0-15 PSI.
– Tighten the service port nut.
– Be sure to check for gas leakage.
Summary of Contents for MRM09Y1J
Page 8: ...8 INTRODUCTION MWM09Y1J MWM12Y1J Figure 101 Indoor Units MWM18Y3J MWM24Y3J MWM36Y3J...
Page 37: ...37 OPERATION 18 24kSequenceofOperation...
Page 38: ...38 OPERATION 18 24k Sequence of Operation O o 0 C L A B C D 1 1 4...
Page 39: ...39 OPERATION 18 24k Sequence of Operation...
Page 40: ...40 OPERATION 18 24k Sequence of Operation...
Page 41: ...41 OPERATION 18 24k Sequence of Operation...
Page 47: ...47 INSTALLATION...
Page 48: ...48 INSTALLATION Installation Tools...
Page 95: ...95 TROUBLESHOOTING Malfunction of IDU Fan Motor U8 Service Manual No Start End...
Page 116: ...116 FIgure 901 PARTS CATALOG Indoor Unit MWM09Y1J MWM12Y1J MWM09Y1J MWM12Y1J...
Page 118: ...118 FIgure 902 PARTS CATALOG Indoor Unit MWM18Y3J MWM24Y3J...
Page 123: ...123 FIgure 904 PARTS CATALOG Outdoor Unit MRM09Y1J MRM12Y1J MRM09Y1J MRM12Y1J...
Page 126: ...126 PARTS CATALOG Outdoor Unit MRM18Y3J FIgure 905...
Page 128: ...128 PARTS CATALOG Outdoor Unit MRM24Y3J FIgure 906...