Quick Start Guide

FUSION-TEC

®

 

/LV1000 Air Conditioning System

SYSTEM SET-UP

Set up and configuration must be done to each wall-
mount unit using the TEC-EYE hand-held diagnostic tool. 
Use the LV1000 controller for the remaining steps.

IMPORTANT:

 

When working with circuit board 

components, Bard recommends the use of 

an anti-static wrist strap to prevent static 

electricity shorts to electronic controls.

Address each wall unit and select unit of measure (UOM) 

and economizer control type (TEC-EYE)

The address of the unit being looked at will be listed in 
the upper right hand corner on the status screen. The 
available addresses are 1-4.
1.  Connect TEC-EYE

TM

 to wall-mount unit.

2.  Press MENU key to access the Main Menu screen. 
3.  Press UP or DOWN keys and ENTER key to enter 

password 1313.

4.  Press UP or DOWN keys to scroll to 

Sys Config

; press 

ENTER key.

5.  Press UP or DOWN keys to scroll to 

Unit Setup (A1)

 

screen.

6.  Press ENTER key to scroll to 

Unit Address.

7.  Press UP or DOWN keys to change address to value 

between 1 and 4.

 

NOTE:

 Each unit must have a unique address for the 

communication to work properly. Bard also 

recommends labeling each unit for ease in 

identification.

8.  Press ENTER key to save and scroll to 

UOM

9.  If desired, press UP or DOWN keys to change the 

value from 

USA

 to 

SI

NC

,

 LON

CAN

 or 

UK

. Units 

are preconfigured for each selection.

10. Press ENTER key to save and move the cursor back 

to the top left position.  

11. Press DOWN key to navigate to 

Economizer Setup 

(A2)

 screen.

12. Press ENTER key to scroll to 

Type

13. Press UP or DOWN keys to change economizer type to 

None

Drybulb

Temperature and Humidity

 or 

Enthalpy

.

14. Press ENTER key to save and move the cursor back 

to the top left position. 

Execute a run test on each unit to verify the equipment is 

functioning correctly (TEC-EYE)

1.  Use UP or DOWN keys to scroll to 

Run Test (A10)

 

screen.

2.  Press ENTER key to scroll to 

Run Test Enable

 

parameter.

3.  Use UP or DOWN key to change value to 

ON

. The run 

test will begin and the screen will change to 

Run Test 

Summary

.

4.  Press UP or DOWN key to scroll between 

Run Test 

Summary

,

 Motors & Sensors

 and 

A/C Circuit 

screens.

See Installation Instructions 2100-674 if additional 
information on run testing units is needed.

Clear unit alarm logs (TEC-EYE)

To clear the wall-mount unit alarm logs:
1.  Press MENU key to go to the Main Menu screen.
2.  Use UP or DOWN keys and ENTER key to enter 

password 1313.

3.  Press UP or DOWN keys to scroll to 

Settings

; press 

ENTER key.

4.  Press UP or DOWN keys to scroll to 

Initialization

press ENTER key.

5.  Press ENTER key to scroll to 

Clear Alarm Logs?

6.  Press UP or DOWN key to change value to 

YES

; press 

ENTER key.

7.  Press ESCAPE key several times to return to Main 

Menu screen.

Manual 2100-675D 

Date 2-20-19

This quick start guide is designed to lead the installer 
through the steps necessary for setting up the FUSION-
TEC/LV1000 Free Cooling Unit System. See the latest 
versions of FUSION-TEC/LV1000 System Installation 
Instructions 2100-674, FUSION-TEC Service Instructions 
2100-694 and LV1000 Service Instructions 2100-673 
for more detailed information on the installation, service 
and maintenance of the FUSION-TEC/LV1000 system.
The LV1000 controller and TEC-EYE

TM

 hand-held 

diagnostic tool will both be used in this installation. The 
TEC-EYE diagnostic tool is shipped inside the controller. 
Use password 1313.

It is important to check the software version 

during installation to ensure that the latest 

version has been installed. Current software 

versions, change log and installation 

instructions are available on the Bard website at 

http://www.bardhvac.com/software-download/