RWB II ROTARY SCREW COMPRESSOR UNITS
MAINTENANCE
S70-200 IOM
Page 33
MAINTENANCE SCHEDULE
This schedule should be followed to ensure trouble-free operation of the compressor unit.
95000
90000
85000
80000
75000
70000
65000
60000
55000
50000
45000
40000
35000
30000
25000
20000
15000
10000
8000
5000
1000
200
MAINTENANCE
HOURS OPERATION (MAXIMUM)
OPERATING LOG
The use of an operating log, as included in this manual, permits thorough analysis of the operation of a refrigeration system by
those responsible for its maintenance and servicing. Continual recording of gauge pressures, tem per a tures, and other pertinent
information, enables the observer and serviceman to be constantly familiar with the operation of the system and to recognize
immediately any deviations from normal operating conditions. It is recommended that readings be taken at least every four hours.
See Table of Contents for "OPERATING LOG SHEET".
CHANGE OIL
As directed by oil analysis
OIL ANALYSIS
Then every 6 months
CHANGE FILTERS
CLEAN OIL
STRAINERS
CLEAN LIQUID
STRAINERS
CHANGE COALESCERS
CHECK AND CLEAN
SUCTION SCREEN
CHECK ALIGNMENT
CHECK COUPLING
VIBRATION ANALYSIS
Every 6 months, more frequently if levels increase
REPLACE SEAL
When leak rate exceeds 7 - 8 drops per minute