Stacking Frame Installation
1. Remove Top Tile at desired location by
pulling towards you to disengage top
clips from the Frame, pull Tile up to
disengage bottom hooks from Frame.
Repeat for other side of Frame.
2. Pull Top Cap upward to disengage the
clips and set aside.
3. Position Stacking Frame above existing
Frame, aligning the holes in brackets
with the holes in the Frame. Install two
(2) bolts and nut plates provided. Do not
tighten.
4. If installing two (2) Stacking Frames side
by side, install Draw Nut as shown.
5. Tighten bolts into nut plate.
6. Reinstall Top Cap on Stacking Frame.
Stacking Frame and Stacking Connector Installation
WARNING:
Never install Worksurfaces on Stacking Frames.
Never install more than two Stacking Frames on top of each other.
If loading 2-High Stacking Frame, the 900 Corner Stacking Connector
and adjacent Stacking Frames must be used.
Rectangular Slot
Stacking Frame
Draw Nut
Bolts
Stacking Connector Installation
1. Remove existing Connector Top Cap and
Cover and set aside.
2. Position Stacking Connector on top of exist-
ing Connector, engage Draw Nut into the
rectangular slots in both the Frame and the
Connector, and tighten screw.
3. Install Top Cap onto Stacking Connector.
4. Install Replacement Cover.