
Page 5
Tiles
™
Installation Manual
Frame
Change of
Height Wedge
Change of
Height Wedge
Frame to Unequal Height Frame
1. Remove Change of Height Wedge from
the hardware package supplied with
Change of Height Finished End.
2. Insert Change of Height Wedge in Taller
Frame Channel opening that matches
the height of the shorter Frame’s
notched tab. Rotate Wedge into position.
Tighten screw.
3. Loosen Cap Screw on Draw Rod that
matches the height of the smaller
Frame.
4. Connect Draw Rod to the shorter Frame
by inserting the bottom hook of the Draw
Rod into the rectangular opening at the
bottom of the Frame. Line up the Cap
Screw on the Draw Rod with the notched
tab on the smaller Frame.
5. Lift the shorter Frame and Draw Rod,
so the bottom hook on the Draw Rod
engages into the rectangular opening at
the bottom of the taller Frame.
6. Position both Frames so that the Cap
Screw on the Draw Rod lines up with the
notched tab of Change of Height Wedge.
7. Hold both Frames together, and tighten
Cap Screw until Frames come into con-
tact with each other.
Frame to Unequal Height
Connector
1. Assemble Frame and Connector us-
ing the same procedure as Frame to
unequal height Frame.
2. Change of Height Wedge must be
installed on Connector.
Tiles Assembly, Frames, Connectors, and Change
of Height Wedge Installation
Draw Rod
Frame