
Page 2
Tiles
™
Installation Manual
Introduction ........................................................................................................................................................... 3
Tile Assembly, Frames, Connectors,
and Change of Height Wedge Installation ............................................................................................................ 4
Tiles Assembly, Frames, Connectors, and Change of Height Wedge Installation ............................................... 5
Connectors Cover, Finished End Cover, Finished End
Change of Height Cover, Installation .................................................................................................................... 6
Stacking Frame, and Stacking Connector Installation .......................................................................................... 7
8-Wire Electrical, Base Feed Installation .............................................................................................................. 8
8-Wire Electrical, Base Power Retro,
and Beltline Power Retro Installation .................................................................................................................... 9
8-Wire Electrical, Beltline Power Retro Duplex Clip Installation ........................................................................... 10
8-Wire Electrical, In-Frame Power Jumper
and Pass-Through Power Jumper Installation ...................................................................................................... 11
8-Wire Electrical, Beltline Power Transfer Installation .......................................................................................... 12
Fabric Tiles, Marker Board Tiles, Perforated Tiles,
and Window Tiles Installation ............................................................................................................................... 13
Rail Tiles, Power and Data Tiles Installation ........................................................................................................ 14
Shelf Ends and Shelf Installation .......................................................................................................................... 15
Flipper Door Unit Door/Cover Installation ............................................................................................................. 16
Worksurface Installation ....................................................................................................................................... 17
Worksurface Installation ....................................................................................................................................... 18
Worksurface Installation ....................................................................................................................................... 19
Transaction Surfaces Installation ......................................................................................................................... 20
Worksurface Support End Panels, and Half Leg Installation ................................................................................ 21
Open Metal Worksurface Support Installation ...................................................................................................... 22
Door Frame Installation ........................................................................................................................................ 23
Supporting Pedestals and Lateral Files Installation .............................................................................................. 24
Table of Contents