Installing the ValueLoader
Connecting the SCSI and Power Cables
ValueLoader LTO Tape Autoloader User Manual
13
4
Slide the ValueLoader onto the rails and secure the mounting
bracket to the rack using the screws and clip nuts from the
rackmount hardware package, as shown in
figure 7
.
Figure 7 Sliding the
ValueLoader into the
Rack Slot
Connecting the SCSI and Power Cables
1
To connect the SCSI and power cables to the ValueLoader, follow
these steps:
1
Shut down and turn off the selected server. Turn off all
attached accessory devices, such as printers and other SCSI
devices. Remove the power cables from the server and all
attached accessories.
Caution:
Failure to remove the power cables from these
devices may result in damage to the
ValueLoader.
Summary of Contents for ValueLoader
Page 1: ...ValueLoader LTO Tape Autoloader User Manual 6326709 01 Ver A Rel 01...
Page 6: ...vi ValueLoader LTO Tape Autoloader User Manual...
Page 10: ...Tables x ValueLoader LTO Tape Autoloader User Manual...
Page 14: ...xiv ValueLoader LTO Tape Autoloader User Manual...
Page 88: ...74 ValueLoader LTO Tape Autoloader User Manual...