Foundry NetIron MLX Series Installation and Basic Configuration Guide
3-48
© 2008 Foundry Networks, Inc.
December 2008
Figure 3.41 Removing the Power lugs
3.
Crimp #4 AWG power supply wire into the power lugs. See Figure 3.41
CAUTION:
For the NEBS compliant installation of a NetIron MLX -4, -8, -16, and -32 with AC and DC system
use a ground wire of at least 6 American Wire Gauge (AWG). The ground wire should have an agency-approved
crimped connector (provided with the chassis) attached to one end, with the other end attached to building
ground. The connector must be crimped with the proper tool, allowing it to be connected to both ground screws on
the enclosure. Before crimping the ground wire into the provided ground lug, insure the bare copper wire has been
cleaned and antioxidant is applied to the bare wire.
Figure 3.42 Crimping the Power Supply Wire in the Lug
4.
Reconnect the power lugs to the power supply unit.
5.
Re-attach the safety cover over the power supply lugs that was removed in Step 1. See Figure 3.42.
Power lug (2x)
Lug screws
#4 AWG Power Supply Wire
Power lug