Foundry NetIron MLX Series Installation and Basic Configuration Guide
3-38
© 2008 Foundry Networks, Inc.
December 2008
Cable Routing for the Upper-left Quadrant
Route slot cards in the numerical order starting with the cables of Slot Card #1:
1.
Route slot cards #1 and #2 cables directly to the left through the side comb. See Figure 3.30.
Figure 3.30 Routing Upper-left Quadrant Cables to the Left
Side combs (18)
Cables from Slot #1
Cables from Slot #2
Uppe
e Quad a