Commissioning Checklist
FORUM Handling Tools strongly recommends to accomplish the commissioning with the
FORUM Handling Tools Commissioning Service.
Prior to use of the FORUM Handling Tools following checks must be carried out :
OK
Operating personnel is aware of all dangers regarding handling the FORUM Handling Tools PS-500 and
its additional equipment.
OK
The entire operating personnel went through the OMM.
Check Installation and Lubrication
OK
PS-500 and all additional components are installed as shown in chapter 3.
OK
The Installation Checklist has been filled out completely. No fields are left blank and no fields have the
status NOK.
OK
All parts, components (lifting equipment, etc.) not required for the actual operation have been removed.
OK
There are no people in the working area.
OK
All assemblies, parts, areas and surfaces, which have to be lubricated, are lubricated.
Hydraulic Characteristics
OK
Operating pressure.
160 bar (2320 PSI) - 210 bar (3046 PSI)
OK
Volumetric flow.
18.9 l/min (5 GPM) - 37.85 l/min (10GPM)
OK
Min. required hydraulic Oil clearness.
NAS 7
OK
Correct Hydraulic connection/line arrangement.
OK
Automatic lubrication system has been connected to the PS-500.
Function Test
OK
HCGS centers the pipe prior setting the Slip Assembly [if applicable].
OK
Slip Assembly is set after supplying pressure to connection "A".
Feedback signal appears.
OK
HCGS opens automatically after setting the Slip Assembly [if applicable].
OK
Slip Assembly is raised after supplying pressure to connection "B".
Feedback signal appears.
OK
Slip Assembly remains in raised position by a pressure drop to connection "B".
OK
One greasing cycle has been manually activated and finished.
OK
Grease is coming out of bores.
OK
Automatic grease function adjusted (5 sec. of greasing after 10 cycles).
Info
This commissioning Checklist contains only
essential points and main contents of an internal
commissioning. Check at least the mentioned
points on your PS-500. For further questions or
complete Commissioning Checklists (templates),
please contact the Technical Support from
FORUM Handling Tools.