![Forum 755000 Operating Instructions Manual Download Page 58](http://html.mh-extra.com/html/forum/755000/755000_operating-instructions-manual_2322562058.webp)
Operation Maintenance Manual
Power Slip PS-500
PN 757000-D - Revision: 17 (up to SN 138212) 06-2018
58
TR
A
N
SP
O
RT/
IN
STA
LL
AT
IO
N
3.4.2
Installation and Arrangement
of additional Equipment
3.4.2.1
Installation of the Top Wear Guide
Preparations/Requirements
• The correct size Top Bowl has been chosen.
• Guide Plates are retracted.
• Insert Carriers have been removed.
• The PS-500 is mounted to the Rotary Table or standing
on a plane supporting surface.
• PS-500 is equipped with a HCGS.
• HCGS has been switched off.
• Lifting Sling (Hook Up Kit - P/N 755661).
Installation Procedure
1. Attach the Top Wear Guide to the Lifting Slings
q
.
Only use the attachment points shown in 3.3.6.
2. Lift and position the Top Wear Guide coaxial to the
PS-500
w
.
3. Slowly lower the Top Wear Guide.
4. Guide the Top Wear Guide brackets into the HCGS
holes
e
.
5. Secure the Top Wear Guide by turning the bracket
handles
r
.
6. Remove the lifting eyes and the Lifting Slings.
Removal Procedure
1. Perform removal procedure in reverse order.
CAUTION
Always make sure all handles of the Top
Wear Guide brackets point towards the center of the
PS-500 to lock the Top Wear Guide to the HCGS.
Fig. 75: Installation Step I
Fig. 76: Installation Step II
q
e
r
r
w