Operation Maintenance Manual
Power Slip PS-500
PN 757000-D - Revision: 17 (up to SN 138212) 06-2018
48
TR
A
N
SP
O
RT/
IN
STA
LL
AT
IO
N
3.1.2
Unpacking and Disposal
of Packing Material
Remove the transport packaging and transport aids before
hoisting the PS-500.
NOTE
Do not remove transport retainers!
The transport retainers should be removed only at the
installation site just before startup.
Check scope of delivery
1. Is any transport damage visible?
2. Is the shipment complete? Compare the scope
of delivery with the specifications in the shipping
documents.
If the PS-500 has been damaged during transport or the
shipment is incomplete, please notify the manufacturer
immediately (refer to section XI “Contact Worldwide” on
page 12).
Dispose of the packaging material ecologically in
compliance with all applicable regulations.
3.1.3
Intermediate Storage
If intermediate storage of the Equipment is necessary,
observe the following:
• Leave the PS-500 in its transport packaging. This
provides sufficient protection against external
influences.
• Secure the PS-500 to prevent it from slipping or falling
due to motion.
Fig. 54: Typical transport and conservation packing for a PS-500
Following space requirements are needed during operation
and maintenance.
3
Transport / Setup
Ensure that only sufficiently qualified
and trained personnel accomplish
transport and setup work.
Read these instructions carefully before
setting up the Equipment and putting
it into service.
3.1
Delivery
The PS-500 and all accessory parts are shipped on
transport pallets or crates. All items on the pallets are
secured against tipping and slipping with transport straps.
» Instructions for safe transport are attached to the
transport crate.
» Transport the packed equipment as specified in these
instructions.
3.1.1
Scope of Delivery
INFO
The contract documents and shipment papers
specify the precise scope of delivery. Check
these documents carefully on delivery. In the
event of any discrepancies, please contact the
FORUM Handling Tools representative - refer to
section XI “Contact Worldwide” on page 12
immediately.
The scope of supply includes all components required for
the intended operation of the PS-500:
- PS-500 including HCGS or Top-Cover.
- Slip Assembly.
- Insert Carrier Assembly for pipe diameter (as ordered).
- Guide plates for pipe diameter (as ordered).
- Hook UP Kit.
- Optional accessories (as ordered).