Operation Maintenance Manual
06-2018
PN 757000-D - Revision: 17 (up to SN 138212) Power Slip PS-500
139
IN
SP
EC
TI
O
N /
M
AI
N
TE
NAN
C
E
6.4
Critical Areas
Check critical areas shown according to inspection checklists.
Fig. 150: Critical Areas Body
Fig. 151: Critical Areas Insert Carrier
Fig. 152: Critical Areas Door
Fig. 153: Critical Area Slip I
Fig. 154: Critical Area Slip II