49
3. Insert the other end of the sanitizer tube into
the fitting on the Sanitizer Tank. (See
Figure 122.)
Figure 122
4. Remove the hand pump from the Sanitizer
Tank and fill the Tank with approved
sanitizer solution. (See Figure 123.)
Figure 123
NOTE:
USE THE REMAINING SANITIZER
SOLUTION FOR MANUAL SANITIZING IN
THE CLEAN-IN-PLACE PROCEDURE, DAILY
OPENING PROCEDURES, OR DAILY
CLOSING PROCEDURES.
5. Reinstall the hand pump and tighten
sufficiently. Using the handle, pump air into
the Sanitizer Tank to prime the pump
(approximately 10 strokes.) (See
Figure 124.)
Figure 124
NOTE:
NO PRESSURE IS NEEDED IN THE
TANK DURING NORMAL OPERATIONS.
Sanitizing the Injector System
If the Injector Assembly is already assembled,
disassemble it according to instructions in the
DAILY CLOSING PROCEDURES.
1. Prepare approved sanitizer solution
according to manufacturer’s instructions.
2. Place the Gear Box, Suspension Bracket,
Gear Cartridge, and Injector Head in
approved sanitizer solution and soak for 1
minute. (See Figure 125.)
Figure 125
3. Remove each part from the sanitizer
solution. Place the items on a sanitary tray
to air dry. (See Figure 126.)
Figure 126
4. Remove the cap and spray the cap and
Syrup Line Manifold opening with approved
sanitizer solution. Allow them to sanitize for
at least 1 minute. (See Figure 127.)
Figure 127
Summary of Contents for FB 80-08
Page 5: ...4 General System Overview Figure 1 ...
Page 7: ...6 26 MIS 3067 OPEN CLOSED BUSHING 1 Strain relief for internal 9 Tube Assembly ...
Page 12: ...11 Syrup Pump and Related Parts Figure 4 ...
Page 14: ...13 Sanitizer Pump and Related Parts Figure 5 ...
Page 16: ...15 Electronic Parts and Connections Figure 6 ...
Page 18: ...17 Spare Parts Kit Figure 7 ...
Page 19: ...18 ...
Page 23: ...22 ...
Page 31: ...30 ...
Page 65: ...64 ...