36
29. Push the Coupler Nut into the Coupler Body
and rotate the Coupler Body until motion
stops to secure. (See Figure 76.)
Figure 76
30. Replace the cap and hang the Assembly
onto the Accessory Hanging Bracket. (See
Figure 77.)
Figure 77
31. Perform the entire DAILY CLOSING
PROCEDURES to clean and sanitize the
Injector System. This may also be done
during the Pump Flush Process as time
allows.
32. Perform the “Assembling the Injector
Assembly” and “Installing the Injector
System” sections of the DAILY OPENING
PROCEDURES.
33. Prime the syrup system as instructed in
“Priming the Syrup System.”
Priming the Syrup System
Priming the syrups is necessary when first
installing the flavors, after the Clean-In-Place
procedure, when an individual flavor or multiple
flavors remain idle for more than 72 hours, and
when changing flavors. Only the syrup lines
directly involved will require this process.
1. Select the number (1-8) of the syrup line
pump you wish to prime.
2. Place a container under the Injector Head to
catch sanitizer solution and/or fresh product
to be dispensed and press PUMP FLUSH to
prime the syrup line. (See Figure 78.)
Figure 78
3. Once syrup flows consistently from the
Injector Head, press OFF to stop the syrup
flow.
NOTE:
THE PUMP FLUSH FUNCTION WILL
AUTOMATICALLY SHUT OFF AFTER 5
MINUTES IF YOU DO NOT PRESS THE “OFF”
KEY.
4. Repeat this entire process for each
additional syrup line.
Summary of Contents for FB 80-08
Page 5: ...4 General System Overview Figure 1 ...
Page 7: ...6 26 MIS 3067 OPEN CLOSED BUSHING 1 Strain relief for internal 9 Tube Assembly ...
Page 12: ...11 Syrup Pump and Related Parts Figure 4 ...
Page 14: ...13 Sanitizer Pump and Related Parts Figure 5 ...
Page 16: ...15 Electronic Parts and Connections Figure 6 ...
Page 18: ...17 Spare Parts Kit Figure 7 ...
Page 19: ...18 ...
Page 23: ...22 ...
Page 31: ...30 ...
Page 65: ...64 ...