www.eu.fishersci.com/fisherbrand
30
3 SYSTEM START UP AND OPERATION
3.1 Check List Prior to System Start Up
Prior to system start up, use the table below to make sure all parts have been
installed and connected, and quality of tap water meets minimal requirements.
Check List
Results
Water quality
Municipal water: TDS < 1000 ppm,
Water temperature: 5 - 35
℃
,
Pressure: 1.0 - 6.0 bar / 15 - 90 psi
Water hardness: < 60 ppm as CaCO
3
If water hardness is greater than 100ppm, Fisher
Scientific suggests you to use an external water
softening device to protect the RO membrane
Tap Water connected
Prefiltration Kit installed and connected to the system
H Pack cartridge installed
U Pack cartridge installed
Water Tank installed
Tubing for the Dispenser plugged in
Data cable for the Dispenser plugged in
Drain tubing installed and laid to the sink