4. Commissioning
4-10
Festo P.BE-SPC11-SYS-ASI-EN en 0203NH
Switch-on behaviour after successful pre-commis-
sioning (in the office)
When the operating voltage is switched on again, the SPC11
shows briefly the firmware version number and then one after
the other the values of the three set parameters. The SPC11
then indicates readines to carry out the teach procedure
(t ...). The t flashes (see Fig. 4/2).
Start: Switch-on
behaviour
Display of
system parameters
Display of
amplification stage
Display of
cushioning stage
Wait approx. 1 second
Wait approx. 1 second
Wait approx. 1 second
The SPC11 waits for
the teach task
The t flashes
Firmware version number
Current value
Current value
Display of
firmware version
Wait approx. 0.5 second
Current value
Fig. 4/2: Switch-on behaviour of the SPC11 after
pre-commissioning (in the office)
The teach procedure can be started (see section 4.3.1).
Summary of Contents for Soft Stop SPC11 Series
Page 2: ......
Page 14: ...Contents and general instructions XII Festo P BE SPC11 SYS ASI EN en 0203NH ...
Page 15: ...Summary of components 1 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 1 ...
Page 25: ...Fitting 2 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 2 ...
Page 28: ...2 Fitting 2 4 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Page 29: ...Installation 3 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 3 ...
Page 61: ...Commissioning 4 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 4 ...
Page 100: ...4 Commissioning 4 40 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Page 101: ...Diagnosis and error treatment 5 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 5 ...
Page 114: ...5 Diagnosis and error treatment 5 14 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Page 127: ...Technical appendix B 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix B ...