5. Maintenance and conversion
5−12
Festo P.BE−CPASC−EN en 0412b
2. Place the separator element (in Fig.5/4, position
1
) on
the hexagon socket screw.
3. Align the recess in the separator element (in Fig.5/4,
position
2
) flush with the fixing pin.
4. Push the separator element on the right−hand side of the
base block into the apprpriate channel 1, 3 or 5 until it
touches the fixing pin (see Fig.5/4).
1
Recesses in the
separator element
2
Separator
elements
1
2
Fig.5/4:
Fitting pressure zone separator elements
5. Pull the fixing pin by the projecting dismantling aid out of
the hole (in the example in VP 4).
6. Insert the fixing pin into the hole of the appropriate chan
nel on the next valve location. The relevant holes are
marked in black in example (Fig.5/3) in VP5.
7. Tighten the separator element with 0.8 Nm + 20 %.
8. Cover the valve location or fit equipment into it.
Protect an unused valve location with a blanking plate
and the electrical contacts with the cover foil supplied
with the set.
Summary of Contents for Smart cubic CPA-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPASC EN en 0412b...
Page 16: ...Contents and general instructions XIV Festo P BE CPASC EN en 0412b...
Page 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0412b Chapter 1...
Page 41: ...Fitting 2 1 Festo P BE CPASC EN en 0412b Chapter 2...
Page 53: ...Installation 3 1 Festo P BE CPASC EN en 0412b Chapter 3...
Page 81: ...Commissioning 4 1 Festo P BE CPASC EN en 0412b Chapter 4...
Page 98: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0412b...
Page 99: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0412b Chapter 5...
Page 112: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0412b...
Page 113: ...Technical appendix A 1 Festo P BE CPASC EN en 0412b Appendix A...
Page 129: ...Index B 1 Festo P BE CPASC EN en 0412b Appendix B...
Page 130: ...B Index B 2 Festo P BE CPASC EN en 0412b Contents B Index B 1...
Page 136: ...B Index B 8 Festo P BE CPASC EN en 0412b W Weights A 4...