3. Installation
3−3
Festo P.BE−CPASC−EN en 0412b
Contents of this chapter
This chapter deals with the tubing and wiring of the CPA−SC
valve terminal. The following belong here:
general instructions on preparing the compressed air and
the tubing
instructions on pilot control of the valve solenoid coils
with internal or external pilot air
instructions on operating the valve terminals with
pressure−zone separation
notes on vacuum/low pressure operation
fitting the QS screw connectors
connecting the power supply
earthing the valve terminal
address assignment of the valves
Further information
Instructions on connecting the electric multipin can be found
in the leaflet supplied with the product.
Summary of Contents for Smart cubic CPA-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPASC EN en 0412b...
Page 16: ...Contents and general instructions XIV Festo P BE CPASC EN en 0412b...
Page 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0412b Chapter 1...
Page 41: ...Fitting 2 1 Festo P BE CPASC EN en 0412b Chapter 2...
Page 53: ...Installation 3 1 Festo P BE CPASC EN en 0412b Chapter 3...
Page 81: ...Commissioning 4 1 Festo P BE CPASC EN en 0412b Chapter 4...
Page 98: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0412b...
Page 99: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0412b Chapter 5...
Page 112: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0412b...
Page 113: ...Technical appendix A 1 Festo P BE CPASC EN en 0412b Appendix A...
Page 129: ...Index B 1 Festo P BE CPASC EN en 0412b Appendix B...
Page 130: ...B Index B 2 Festo P BE CPASC EN en 0412b Contents B Index B 1...
Page 136: ...B Index B 8 Festo P BE CPASC EN en 0412b W Weights A 4...