5. Maintenance and conversion
5−11
Festo P.BE−CPASC−EN en 0412b
1
Valve location 4
(VP 4)
2
VP 5
3
VP 6
1
2 3
Fig.5/3:
Implementing pressure zones
Preliminary work:
1. Remove the pneumatic screw connector of the relevant
channel (channel 1, 3 or 5) to the right on the base block.
2. Remove the valve plate, after the position of which the
channel is to be separated (in the example on VP 5).
3. In order to facilitate fitting, remove also the valve plate in
front (in the example on VP 4).
Fitting
1. Insert the fixing pin (in Fig.5/2 position
5
) for position
ing the separator element into the appropriate hole of
channel 1, 3 or 5. The relevant holes are marked in black
in the example (Fig.5/3) on VP 4.
Summary of Contents for Smart cubic CPA-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPASC EN en 0412b...
Page 16: ...Contents and general instructions XIV Festo P BE CPASC EN en 0412b...
Page 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0412b Chapter 1...
Page 41: ...Fitting 2 1 Festo P BE CPASC EN en 0412b Chapter 2...
Page 53: ...Installation 3 1 Festo P BE CPASC EN en 0412b Chapter 3...
Page 81: ...Commissioning 4 1 Festo P BE CPASC EN en 0412b Chapter 4...
Page 98: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0412b...
Page 99: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0412b Chapter 5...
Page 112: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0412b...
Page 113: ...Technical appendix A 1 Festo P BE CPASC EN en 0412b Appendix A...
Page 129: ...Index B 1 Festo P BE CPASC EN en 0412b Appendix B...
Page 130: ...B Index B 2 Festo P BE CPASC EN en 0412b Contents B Index B 1...
Page 136: ...B Index B 8 Festo P BE CPASC EN en 0412b W Weights A 4...