1. Commissioning
1-11
Festo P.BE-CTEU-CO-OP+MAINT-EN en 1101NH
1.5
Communication
When the fieldbus stations are switched on they all assume
the “pre-operational” status and wait for instruction from the
master controller.
1.5.1
Structure of communication
Pre-operational
Only SDOs can be parameterised in this status. This paramet-
erisation corresponds to the asynchronous transmission
which is standard with most PLC controllers. Conversion to
e.g. synchronous transmission is possible if the communica-
tion parameters are written with the appropriate values from
the DS301 communication profile, but modifying the mapping
is not possible.
Operational
After successful parameterisation the master controller can
switch the fieldbus stations to the “operational” status with a
special Network Management Telegram (NMT).
Communication via both SDOs and PDOs is possible in this
status. With the aid of the NMT telegrams you can switch
between the different states, if required.
Summary of Contents for CTEU-CO
Page 2: ......
Page 14: ...Installation XII Festo P BE CTEU CO OP MAINT EN en 1101NH ...
Page 15: ...Commissioning 1 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Chapter 1 Commissioning ...
Page 37: ...Diagnosis 2 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Chapter 2 Diagnosis ...
Page 51: ...Error treatment 3 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Chapter 3 Error treatment ...
Page 58: ...3 Error treatment 3 8 Festo P BE CTEU CO OP MAINT EN en 1101NH ...
Page 59: ...Technical appendix A 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Appendix A Technical appendix ...
Page 74: ...A Technical appendix A 16 Festo P BE CTEU CO OP MAINT EN en 1101NH ...
Page 75: ...Index B 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Appendix B Index ...
Page 76: ...B Index B 2 Festo P BE CTEU CO OP MAINT EN en 1101NH Contents B Index B 1 ...