3. Error treatment
3-7
Festo P.BE-CTEU-CO-OP+MAINT-EN en 1101NH
Fail State on: after fieldbus communication is restored the
outputs resume the status assumed before the failure
(“hold last state”).
3.1.6
Read out diagnostic messages via CANopen
The devices connected to the bus nodes can offer advanced
diagnostic options, which extend beyond the LED displays, if
LED X1 and/or X2 flashes green.
Option 1
Proceed as follows:
1. Activate Node guarding or Heartbeat on the master con-
troller.
2. Wait for the display of the Emergency Messages
(see Tab. 3/10) on the master controller.
Error causes
Device
on the
bus node
Byte
0
1
2
3
4
5
6
7
No load voltage or
insufficient load
voltage
I-Port 1
20
33
85
12
51
00
00
res.
No load voltage or
insufficient load
voltage
I-Port 2
20
33
85
00
00
12
51
Tab. 3/10:
Extract from the Emergency Message table (see section 2.3.2)
Option 2
Proceed as follows:
•
Retrieve the SDO telegrams manually from the bus node
and evaluate them (see object directory in section A.2)
Summary of Contents for CTEU-CO
Page 2: ......
Page 14: ...Installation XII Festo P BE CTEU CO OP MAINT EN en 1101NH ...
Page 15: ...Commissioning 1 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Chapter 1 Commissioning ...
Page 37: ...Diagnosis 2 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Chapter 2 Diagnosis ...
Page 51: ...Error treatment 3 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Chapter 3 Error treatment ...
Page 58: ...3 Error treatment 3 8 Festo P BE CTEU CO OP MAINT EN en 1101NH ...
Page 59: ...Technical appendix A 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Appendix A Technical appendix ...
Page 74: ...A Technical appendix A 16 Festo P BE CTEU CO OP MAINT EN en 1101NH ...
Page 75: ...Index B 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Appendix B Index ...
Page 76: ...B Index B 2 Festo P BE CTEU CO OP MAINT EN en 1101NH Contents B Index B 1 ...