1. Commissioning
1-5
Festo P.BE-CTEU-CO-OP+MAINT-EN en 1101NH
Correct commissioning of the bus node requires you to be
familiar with CANopen and be acquainted with the
above- mentioned specifications.
1.1.4
Brief overview of the scope of functions
–
Module states and boot-up as per Communication Profile
DS301
–
1 Service Data Object for read and write access to the
object directory: Send and Receive SDO
–
2 Process Data Objects for access to digital inputs:
Transmit PDO 1 and 2
–
2 Process Data Objects for access to digital outputs:
Receive PDO 1 and 2
–
Emergency telegram for fault message to the master
controller
–
Node guarding and Heartbeat
–
Default setting of all identifiers as per DS301 and the
station number (predefined connection set)
–
Variable mapping
Summary of Contents for CTEU-CO
Page 2: ......
Page 14: ...Installation XII Festo P BE CTEU CO OP MAINT EN en 1101NH ...
Page 15: ...Commissioning 1 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Chapter 1 Commissioning ...
Page 37: ...Diagnosis 2 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Chapter 2 Diagnosis ...
Page 51: ...Error treatment 3 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Chapter 3 Error treatment ...
Page 58: ...3 Error treatment 3 8 Festo P BE CTEU CO OP MAINT EN en 1101NH ...
Page 59: ...Technical appendix A 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Appendix A Technical appendix ...
Page 74: ...A Technical appendix A 16 Festo P BE CTEU CO OP MAINT EN en 1101NH ...
Page 75: ...Index B 1 Festo P BE CTEU CO OP MAINT EN en 1101NH Appendix B Index ...
Page 76: ...B Index B 2 Festo P BE CTEU CO OP MAINT EN en 1101NH Contents B Index B 1 ...