Commissioning
48
© Festo Didactic
8065842 en
7.4.2
Connecting the CP application module electrically to basic module CP Lab Conveyor
SysLink-interface for digital signals
NOTE
With special variants of the basic module CP Lab Conveyor, you absolutely have to
observe the corresponding operation instructions of the basic module CP Lab Conveyor!
The CP application module exchanges digital input and output signals with the basic module via the
SysLink interface:
•
Connect the I/O terminal (3) of the CP application module with the control (1) of the basic module
CP Lab Conveyor. Therefore use the connecting cable with SysLink plugs (5) which has already been
attached to the control and is led out on the back side of the basic module CP Lab Conveyor.
Electrical connections / illustration similar
Position
Description
1
connecting cable with15-pin standard D-Sub-plugs
2
basic module CP Lab Conveyor: control or decentralized periphery
3
CP application module: I/O terminal (+BG-XD1)
4
CP application module: analogue terminal (+BG-XD2A)
5
connecting cable with a SysLink-plug (SysLink-cable)
6
basic module CP Lab Conveyor: board at the back (+G1-XZ2)
Summary of Contents for CP Factory
Page 21: ...Fundamental safety instructions Festo Didactic 8065842 en 21 4 11 CE Declaration of Conformity...
Page 22: ...Fundamental safety instructions 22 Festo Didactic 8065842 en...
Page 23: ...Fundamental safety instructions Festo Didactic 8065842 en 23...
Page 27: ...Technical data Festo Didactic 8065842 en 27 Illustration similar...
Page 68: ...Operation 68 Festo Didactic 8065842 en 4 Choose application...