![FAZUA RIDE 50 TRAIL/STREET Assembly Instructions Manual Download Page 29](http://html1.mh-extra.com/html/fazua/ride-50-trail-street/ride-50-trail-street_assembly-instructions-manual_546993029.webp)
Assembly instructions | English
29
8.2.2 Overview of the 12 V connector box
1. Interface for connection to the bottom bracket
(24)
.
2. Interface for connection to the end user(s)
(25)
.
3. Mounting elements for attaching the 12 V
connector box to the bicycle frame
(26)
.
25
26
24
8.2.3 Repairing the 12 V connector box
→
If the e-bike is already equipped with a 12 V connector box by the OEM, contact the OEM directly in the
event of a repair and follow their instructions for installation and component replacement.
8.2.4 Retrofitting the 12 V connector box on the e-bike
If the 12 V connector box is retrofitted at a later date, the following procedure is recommended:
→
Select a suitable mounting location on the bicycle frame (head tube LOCKER / downtube / seat tube).
→
Select a suitable model variant of the 12 V connector box that has the cable length required for the instal-
lation location.
→
Use 3M™ Scotchlok™ wire connectors for 2 to 3 wires as the connecting element between the 12 V
connector box and the end user (e.g. lighting system).
→
When laying the connection cables, observe the corresponding bending radii of the individual cables.
If necessary, use strain-relieving fasteners.
→
Pay attention to the correct polarity when connecting:
• Black insulated conductor = connection GND (negative pole),
• Red insulated conductor = current-carrying conductor (positive pole)
Summary of Contents for RIDE 50 TRAIL/STREET
Page 1: ...FAZUA R I D E 50 TRAI L STR EET Assembly instructions Edition 2021 EN 09 2021 ...
Page 2: ... 2021 Fazua GmbH All Rights Reserved ...
Page 30: ......
Page 31: ......