7 Standard Operating Procedures
Operations Manual
CR 820 T
Date May 2020
Page 7-4
Inspection
Figure 7.6
- Inspection Areas
1.
Before the start of each day, walk around the machine and check for the following:
a.
Inspect any attachments for damage or excessive wear.
b.
Inspect the radiator guard for trash buildup.
c.
Inspect the cooling system for leaks and trash buildup. Check the hoses, radiator fins, radiator
cap, and the drain areas.
d.
Inspect the engine compartment for leaks and trash buildup. Check for loose or frayed wires.
e.
Check the engine oil level, engine coolant level, hydraulic oil level, and the fuel level.
f.
Inspect all steps, hand holds, and handrails for cleanliness.
g.
Inspect the hydraulic system for leaks and trash buildup.
h.
Be sure all covers and guards are firmly in place, and inspect for damage and loose or missing
bolts.
i.
Be sure all safety items (decals, guards, walkways, etc.) are in place and properly installed.
j.
Verify that all decals are properly adhered to the machine, undamaged, and legible.
k.
Inspect the condition of the track or wheels, depending on the style of machine you have. Repair
or replace as needed.
l.
Make sure the horn, backup alarm, lights, and other components are in proper working order.
m.
Inspect the operator’s station for cleanliness. Remove all trash and dirt buildup.
2.
Correct any problems before starting operation.
Summary of Contents for Bomag CR 820 T Tier 4
Page 2: ...Intentionally Left Blank ...
Page 3: ...Table of Contents Date May 2020 Page 1 Operations Manual CR 820 T TABLE OF CONTENTS ...
Page 10: ...Table of Contents Operations Manual CR 820 T Date May 2020 Page 8 Intentionally Left Blank ...
Page 11: ...1 INTRODUCTION Date May 2020 Page 1 1 Operations Manual CR 820 T 1 INTRODUCTION ...
Page 16: ...1 INTRODUCTION Operations Manual CR 820 T Date May 2020 Page 1 6 Intentionally Left Blank ...
Page 17: ...2 Safety Date May 2020 Page 2 1 Operations Manual CR 820 T 2 SAFETY ...
Page 38: ...2 Safety Operations Manual CR 820 T Date May 2020 Page 2 22 Intentionally Left Blank ...
Page 39: ...3 Technical Data Date May 2020 Page 3 1 Operations Manual CR 820 T 3 TECHNICAL DATA ...
Page 41: ...4 Operator Controls Date May 2020 Page 4 1 Operations Manual CR 820 T 4 OPERATOR CONTROLS ...
Page 99: ...9 Maintenance Date May 2020 Page 9 1 Operations Manual CR 820 T 9 MAINTENANCE ...
Page 126: ...9 Maintenance Operations Manual CR 820 T Date May 2020 Page 9 28 Intentionally Left Blank ...
Page 127: ...10 Storage Date May 2020 Page 10 1 Operations Manual CR 820 T 10 STORAGE ...
Page 129: ...Intentionally Left Blank ...