![Fayat Group DYNAPAC CC224HF Instruction Manual Download Page 95](http://html1.mh-extra.com/html/fayat-group/dynapac-cc224hf/dynapac-cc224hf_instruction-manual_3739713095.webp)
Operation
4812159601_H.pdf
2021-01-14
Preparations before dismantling/assembly.
1
The machine should be standing on a level surface
with the engine switched off and the brakes on.
Make sure that the container is empty and does not
contain any extra material before dismantling.
Attach the lifting devices in the eyes on both sides of
the container.
1- Release the pin in the clamp and remove the clamp
from the machine.
2
2- The clamp is now fitted at the base of the container
as a foot.
3
3- Release the lock on the lower shaft.
4
4- Release the hydraulic hoses and cabling.
Plug the hoses (dust seals) with the enclosed plugs.
5- Now lift off the container with the requisite lifting
device and place on a level surface.
83
Summary of Contents for DYNAPAC CC224HF
Page 2: ......
Page 16: ...Introduction 4812159601_H pdf 2021 01 14 4...
Page 24: ...Safety Optional 4812159601_H pdf 2021 01 14 12...
Page 28: ...Special instructions 4812159601_H pdf 2021 01 14 16...
Page 38: ...Technical specifications 4812159601_H pdf 2021 01 14 26...
Page 76: ...Machine description 4812159601_H pdf 2021 01 14 64...
Page 100: ...Operation 4812159601_H pdf 2021 01 14 88...
Page 122: ...Maintenance Maintenance schedule 4812159601_H pdf 2021 01 14 110...
Page 130: ...Maintenance 10h 4812159601_H pdf 2021 01 14 118...
Page 146: ...Maintenance 500h 4812159601_H pdf 2021 01 14 134...
Page 174: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...