![Fayat Group DYNAPAC CC224HF Instruction Manual Download Page 73](http://html1.mh-extra.com/html/fayat-group/dynapac-cc224hf/dynapac-cc224hf_instruction-manual_3739713073.webp)
Machine description
4812159601_H.pdf
2021-01-14
Power in engine compartment/battery
compartment
Fig. Battery bay
1. Master switch
2. Main fuse panel
1
2
The fuses in the engine compartment are located
alongside the master switch.
The roller is equipped with 24 V electrical system and
an AC alternator.
Connect the correct polarities (ground) to the
battery. The cable between the battery and the
alternator must not be disconnected when the
engine is running.
Connect the correct polarities (ground) to the
battery. The cable between the battery and the
alternator must not be disconnected when the
engine is running.
Main fuse panel (Cummins)
5
Fig. Main fuse panel
1. Master switch
2. Preheating relay (100A)
3. Fuse (F20) (125A)
4. Starter relay (50A)
5. Fuses (F13, F10, F11)
6. Power socket 24V
6
4
3
1
2
The main fuse panel is located behind the left engine
compartment door.
The fuses are placed in the order shown below,
starting by the plate.
F13
Engine ECU
(30A)
F13
Engine ECU
(30A)
F10
Main fuse
(50A)
F10
Main fuse
(50A)
F11
Cab
(50A)
F11
Cab
(50A)
61
Summary of Contents for DYNAPAC CC224HF
Page 2: ......
Page 16: ...Introduction 4812159601_H pdf 2021 01 14 4...
Page 24: ...Safety Optional 4812159601_H pdf 2021 01 14 12...
Page 28: ...Special instructions 4812159601_H pdf 2021 01 14 16...
Page 38: ...Technical specifications 4812159601_H pdf 2021 01 14 26...
Page 76: ...Machine description 4812159601_H pdf 2021 01 14 64...
Page 100: ...Operation 4812159601_H pdf 2021 01 14 88...
Page 122: ...Maintenance Maintenance schedule 4812159601_H pdf 2021 01 14 110...
Page 130: ...Maintenance 10h 4812159601_H pdf 2021 01 14 118...
Page 146: ...Maintenance 500h 4812159601_H pdf 2021 01 14 134...
Page 174: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...