91
Revision date: 12.02.16
Black-out System Installation
SECURE LEADNG EDGES TO MONOFILAMENT WIRES
IMPORTANT:
Before attaching leading edges to
PRQR¿ODPHQWZLUHVYHULI\WKDWWKHOHDGLQJHGJH
SUR¿OHLVFHQWHUHGDQGWKDWWKHERWWRPHGJHRIWKH
OHDGLQJHGJHSUR¿OHLVÀXVKZLWKWKHERWWRPHGJH
RIWKHKHDGHUSUR¿OHDORQJERWKWKHKRUL]RQWDODQG
vertical sections.
1. On the underside of the leading edges, snap
RQHPRQR¿ODPHQWZLUHWZLVWVQDSFOLS
DWHDFKLQWHUVHFWLQJERWWRPPRQR¿ODPHQW
wire location, which is approximately every
0RQR¿ODPHQWFOLSLVJXLGHGRYHUWKH
PRQR¿ODPHQWZLUHDQGWKHQWZLVWVQDSVLQWR
the leading edge channel. See photos.
2. On the topside of the leading edge, lock
LQRQHPRQR¿ODPHQWZLUHJXLGHDW
HDFKLQWHUVHFWLQJWRSPRQR¿ODPHQWZLUH
location, which is approximately every 36".
0RQR¿ODPHQWZLUHJXLGHLVSRVLWLRQHG29(5
WKHPRQR¿OLPHQWZLUHDQGWKHQKRRNORFNV
into the leading edge channel.
ATTENTION:
If possible, on the vertical
sections, attach the 113314 wire guides in
such a way that they act as weight deterrents
from the corner cables. This will help to
prolong the fabric by reducing the friction of
the material against the corner cable.
7RS0RQR¿ODPHQW
%RWWRP0RQR¿ODPHQW
113315
Snap Clip
113314
Wire Guide