16
Revision date: 12.02.16
Rafter Assembly–Support Chords
Complete these basic steps:
1. Slide the 103856 band clamps into position on the assembled rafter.
2. Assemble the 2"x2" square chord tube using 115187 inserts. Do not secure splices yet.
3. Slide 106735 square band clamps onto the chord tube.
4. Secure each splice of the chord tube using FAG363B bolts, FAME08B washers, FAMA38B lock washers, and
FALB04B nuts. See next page.
5. Attach a 115181 U-bracket to each end of the assembled chord tube using FAG363B bolts, FAME08B washers,
FAMA38B lock washers, and FALB04B nuts. See next page.
6. Attach assembled chord to the rafter using: FAG365B (3/8") bolts, FAME08B washers, FAMA38B lock washers,
and FALB04B nuts. See next page.
7. Verify dimensions and position of support chord components and install web strut components.
8. Return to each band clamp and secure each clamp to the rafter using a Tek screw. Install Tek screw in a position
that will not contact the cover or shade panels when they are installed. See next page.
RAFTER ASSEMBLY— Support Chords
Support chord assemblies act as the horizontal surface to which black-out panels are attached, and against which the
black-out panels seal. Additionally, support chord assemblies provide the structural support to support the weight of the
black-out system components. SEE FOLLOWING PAGE FOR ASSEMBLY DETAILS.
3rd Rafter
5th Rafter
12'
12'
ATTENTION:
Support chord components
are NOT installed in the end rafters. The
¿UVWUDIWHUZLWKWKHVXSSRUWFKRUGDVVHPEO\
is the 3rd rafter from the front end and
then every other rafter, or every 12' from
there, as shown.
Actual frame may differ from frame shown in
diagrams. Example shows a 48' long frame.
Applications are the same. Adjust accordingly.