Elpro 7 RP
The 11
th
operation concludes the procedure for the control panel to learn the
required working times.
After the learning procedure it is possible to set the operating modes either ON/OFF
as required by means the dip-switches on the PCB.
!
Preliminary notes to learning mode:
- make sure that the gate is closed
- make sure that the gate stops in the respective open and closed gate positions
are rmly xed to the ground.
1
st
operation:
cut off power supply to Elpro 7 RP by removing the
2 A - 24 V
low voltage white fuse
, which is on the right upper side of
the PCB.
IMPORTANT
: at this stage two options are allowed to go on with setting
ie. learning the required operating times: by the P button or by remote
control. The last option allows the installation agent to have direct visual
control of the operation being performed by the gates.
!
The time passing from 4
th
to 5
th
operations is stored by the system as
the
gate delay time in open cycle
, with the options in service (dip No.
6 = ON) or out of service (dip No. 6 = OFF, the time is stored but no delay
will occur).
!
The time passing from 7
th
to 8
th
operation is stored by the system as
dwell time
, in service on AUTOMATIC MODE (dip No. 3 = ON) or out of
service (dip No. 3 = OFF, dwell time still in the system memory but not
applicable).
!
The time between the 8
th
and 9
th
operations is stored by the system
as
gate delay time on closing cycle
.
7
L7
L7
M1
M2
M1
M2
M1
M2
M2
M1
M2
M1
M1
M2
M1
M2
M1
M2
ELECTRONIC CONTROL PANEL FOR NUPI 66
WITH PROGRAMMABLE RADIO TECHNOLOGY
GB
11
th
operation:
A pulse stops M1 motor (
M1 gate on closed gate position
). In order to ensure
that the gate is securely held in stop position, it is advised to pulse the actuator ie.
gate to stop approx. 3-4 seconds after the gate has reached the end of the permitted
stroke on the closed gate stop position.
2
nd
operation:
hold the
button P
pressed and re-power the PCB by inserting
the
24 V low voltage fuse
back into its holder.
3
rd
operation:
when the
Led L7
illuminates, release
button P
:
Led L7
will ash 5 times and the
ashing lamp will illuminate: the program "learning working times" has been
entered.
4
th
operation:
a pulse to open starts M1 motor (
the rst gate
starts opening
).
5
th
operation:
a pulse to open starts M2 motor (
second gate
starts opening
).
6
th
operation:
a pulse stops M1 motor (
rst gate wide open on
open gate stop
).
7
th
operation:
A pulse stops M2 motor (
second gate wide open
on open gate stop
).
8
th
operation:
a pulse to close starts M2 motor (
M2 gate starts
closing
).
9
th
operation:
a pulse to close starts M1 motor (
M1 gate starts
closing
).
10
th
operation:
a pulse stops M2 motor (
M2 gate on closed gate position
). In order to ensure
that the gate is securely held in stop position, it is advised to pulse the actuator ie.
gate to stop approx. 3-4 seconds after the gate has reached the end of the permitted
stroke on the closed gate stop position.
11
10
9
8
7
6
5
4
3
2
1
L7
L7