A1000
27
532210 04 - Rev.A
24
23
Tr
ansla
tion of the original instruc
tions
ENGLISH
ASSEMBLING THE FRAME
The supply includes:
-
4 leaves (2 fixed leaves and 2 mobile leaves with installed glazing).
-
side and upper balancing profiles
-
alignment profile
-
fixed leaf beading
-
floor shoe
1. Install the upper balancing profile
23
-
.
2. Install the side balancing profiles
23
-
.
3. Mount the floor profile
23
-
.
4. Insert the fixed leaf by tilting it and inserting it into the top profile
24
.
5. Place horizontally then fasten the leaf.
6. Mount the upper labyrinth profile
24
-
.
MOUNTING MOBILE LEAVES
Mount the leaves as described in § 9
29
.
ASSEMBLY OF THE HEAD SECTION TO THE UPPER PROFILE
Mount the assembled head section onto the upper profile by means
of suitable attachments.
After mounting the head section, perform all procedures to secure the
leaf to the carriages as set out in the chapters concerning kit assembly.
For all the adjustment procedures, also refer to chapter § 8
28
.
View from automation side
fixed leaf
mobile leaf
Summary of Contents for A1000
Page 1: ...A1000 EN16005 2012 E1SL fw 3 0 SDK EVO fw 3 0 LK EVO fw 1 2...
Page 108: ...A1000 108 53221004 Rev A Translation of the original instructions ENGLISH...
Page 110: ...A1000 110 53221004 Rev A...
Page 114: ...A1000 114 53221004 Rev A...
Page 115: ...Translation of the original instructions ENGLISH...