8. Check verticality with a spirit level.
9. Adjust the distance between the leaf profile and balancing profile
using the grub screws on the profile
20
-
. This adjustment
corrects any flaws on the wall surface.
10. Check proper vertical and horizontal alignment.
11. Fasten the fixed leaf sides as shown in
20
-
.
!
If the balancing profile needs to be cut, pay attention to the alignment
of the holes, which have a variable spacing. It is recommended to make
the reference marks for the cut starting from the top.
FASTENING THE FIXED LEAVES
Fixed leaves may be:
-
with low skirting
-
with high skirting
Fasten the fixed leaf to the floor by drilling the leaf
21
-
and fasten
it using suitable screws and dowels.
-
Use adequate wall bits and dowels with screws.
!
Ensure there are no hydraulic coils or electrical conduits under the floor
at the planned drill points.
MOUNTING MOBILE LEAVES
Mount the leaves as described in § 9
29
.
GLAZING INSTALLATION
1. Place the 3 shims in the lower part of the profile
21
-
.
2. Place the glazing on the shims.
22
-
!
Handle the glazing adhering to the safety warnings in the Safety chapter.
3. Secure the glass using the beading supplied
22
-
.
4. Insert the beading along the entire length of the perimeter.
!
The seal must be inserted with the spline side towards the inside of the
profile
22
-
.
ASSEMBLY OF THE HEAD SECTION TO THE UPPER PROFILE
Mount the assembled head section onto the upper profile by means
of suitable attachments.
After mounting the head section, perform all procedures to secure the
leaf to the carriages as set out in the chapters concerning kit assembly.
Refer to chapter § 8 also for all the adjustment procedures.
7.2 ENTRY DOOR WITH TK20 PROFILES
PRELIMINARY OPERATIONS
1. Check soundness of the installation opening (Masonry, Structural
Metal Work, etc.).
2. Take the measurements of the opening.
!
The frame must be fastened to the structure with suitable attachments.
Ensure there are no hydraulic coils or electrical conduits under the floor
at the planned drill points.
3. Measure the door frame and compare them with the opening
measurements.
4. Check floor levelness with a spirit level.
Summary of Contents for A1000
Page 1: ...A1000 EN16005 2012 E1SL fw 3 0 SDK EVO fw 3 0 LK EVO fw 1 2...
Page 108: ...A1000 108 53221004 Rev A Translation of the original instructions ENGLISH...
Page 110: ...A1000 110 53221004 Rev A...
Page 114: ...A1000 114 53221004 Rev A...
Page 115: ...Translation of the original instructions ENGLISH...