Operating of the Machine
4-18
© Essemtec AG
Paraquda Startup & Safety
000
00
03/
11
/
N
ov
emb
er 4
, 2
01
4
Change Tape and Reel of components which are off
Draw the feeder out and lift it slightly to remove.
Note: Removing can be done even if the
production is running as long as no
feeder lane is blinking on the feeder to
remove (if blinking, the P&P will access
the lane during the next cycle).
Pull out the cover tape spool with the winded
cover tape.
Pull apart the magnetic held cover tape spool.
Remove the winded cover tape and cut it up.
Open the downholder.
Pull the remaining tape out of the machine
Summary of Contents for Paraquda
Page 8: ......
Page 16: ......
Page 34: ......
Page 83: ...Operating of the Machine Paraquda Startup Safety Essemtec AG 4 11 0000003 11 November 4 2014...
Page 84: ...Operating of the Machine 4 12 Essemtec AG Paraquda Startup Safety 0000003 11 November 4 2014...
Page 117: ...Operating of the Machine Paraquda Startup Safety Essemtec AG 4 45 0000003 11 November 4 2014...
Page 118: ...Operating of the Machine 4 46 Essemtec AG Paraquda Startup Safety 0000003 11 November 4 2014...
Page 129: ...Operating of the Machine Paraquda Startup Safety Essemtec AG 4 57 0000003 11 November 4 2014...
Page 134: ...Operating of the Machine 4 62 Essemtec AG Paraquda Startup Safety 0000003 11 November 4 2014...