Operating of the Machine
Paraquda Startup & Safety
© Essemtec AG
4-23
000
00
03/
11
/
N
ov
emb
er 4
, 2
01
4
Change Tape and Reel of components which are off
Operate the feeder exclusively by its handles
(see picture).
Lift the feeder slightly and draw it out to remove.
Note: Removing can be done even if the
production is running as long as no
feeder lane is blinking on the feeder to
remove (if blinking, the P&P will access
the lane during the next cycle).
Apply the feeder to the external feeder setup
station, mounted on the signal tower.
Remove the empty reel while pulling out the
magnetic held roll holder sheet (see picture).
The 8 mm feeder has two lanes, therefore
contains also two reels (upper reel for left lane,
lower reel for right lane).
Insert the new reel, full of components (upper
and/or lower reel).
Summary of Contents for Paraquda
Page 8: ......
Page 16: ......
Page 34: ......
Page 83: ...Operating of the Machine Paraquda Startup Safety Essemtec AG 4 11 0000003 11 November 4 2014...
Page 84: ...Operating of the Machine 4 12 Essemtec AG Paraquda Startup Safety 0000003 11 November 4 2014...
Page 117: ...Operating of the Machine Paraquda Startup Safety Essemtec AG 4 45 0000003 11 November 4 2014...
Page 118: ...Operating of the Machine 4 46 Essemtec AG Paraquda Startup Safety 0000003 11 November 4 2014...
Page 129: ...Operating of the Machine Paraquda Startup Safety Essemtec AG 4 57 0000003 11 November 4 2014...
Page 134: ...Operating of the Machine 4 62 Essemtec AG Paraquda Startup Safety 0000003 11 November 4 2014...