![Essemtec Paraquda Startup & Safety Manual Download Page 47](http://html1.mh-extra.com/html/essemtec/paraquda/paraquda_startup-and-safety-manual_2428336047.webp)
Equipment Overview
Paraquda Startup & Safety
© Essemtec AG
2-13
000
00
03/
11
/
N
ov
emb
er 4
, 2
01
4
2.3.10
Toolchanger
Overview
The Paraquda is capable to support up to three
toolchangers to ensure machine performance
for fully equipped machines.
To place with confidence the different
component types and sizes there are different
types of nozzles available to match these
requirements. The Toolchanger can carry these
different types of nozzles. The nozzles are
securely held with a metal sliding gate which will
be opened automatically for tool change. The
Pick-&-Place system gets automatically the
correct nozzle out of the toolchanger according
to the package process parameters (stored in
recipe).
2.3.11
XY Gantry
Overview
The XY gantry entrains the pick-&-place head
and provides head movement in X and Y. It
consists of bearings, toothed belts, 3 motors (Y
Y1 / X) with optical encoders.
Summary of Contents for Paraquda
Page 8: ......
Page 16: ......
Page 34: ......
Page 83: ...Operating of the Machine Paraquda Startup Safety Essemtec AG 4 11 0000003 11 November 4 2014...
Page 84: ...Operating of the Machine 4 12 Essemtec AG Paraquda Startup Safety 0000003 11 November 4 2014...
Page 117: ...Operating of the Machine Paraquda Startup Safety Essemtec AG 4 45 0000003 11 November 4 2014...
Page 118: ...Operating of the Machine 4 46 Essemtec AG Paraquda Startup Safety 0000003 11 November 4 2014...
Page 129: ...Operating of the Machine Paraquda Startup Safety Essemtec AG 4 57 0000003 11 November 4 2014...
Page 134: ...Operating of the Machine 4 62 Essemtec AG Paraquda Startup Safety 0000003 11 November 4 2014...