![Esko Kongsberg XL User Manual Download Page 102](http://html.mh-extra.com/html/esko/kongsberg-xl/kongsberg-xl_user-manual_2427111102.webp)
12
Kongsberg XL
12.8.13. Miscellaneous
Warm Up
Machine Panel Toolbar->Warm Up
To protect the
Spindle
, mandatory
Warm Up
is implemented.
If the
Spindle
has been inactive for 8 hours or more, a 3 min.
Warm Up
is required.
If the
Spindle
has been inactive for 4 weeks or more, an extended sequence is required, called
Run In
.
This takes 20 minutes.
Suction house
Clean the suction house when necessary with acetone and a q-tip. A smooth surface will ease
the chip removal.
Vacuum clean the milling underlay
The
Vacuum Cleaner
can be used for automatic cleaning of the felt mat:
Prepare program to make a file that covers the actual area.
Set “bit size” to 65 mm (2.5 inch).
Hint:
• Make a file name that reflect the size used.
• Prepare
Layer Setup
with low spindle speed, zero depth, and maximum feed.
• Insert the
Dummy Bit
into the
chuck
.
• Adjust the brush height until the brush barely touches the mat surface.
102