Setup (commissioning / first switching)
A
In order to commission the control unit, the
cabin must be switched on at the control panel.
If the display is blank, the relay box might be
switched off.
A unit switch is located on the left side of the
relay box.
Operation basics
All cabin settings are made at the control panel.
All functions must be configured to commission the system.
Add-on modules or accessories are detected after the unit is switched on
again and their corresponding icons appear in the sub-menus.
Position I:
Relay box is switched on (factory setting).
The relay box is ready for operation in standby
mode.
Position 0:
Relay box is completely switched off.
Parts of the circuit board are still under current.
Position II:
Cabin lighting is switched on, relay box is
switched off.
Position for maintenance and cleaning.
A. Unit switch
on relay box
Attention! Parts of the printed circuit
board will still remain energized in the
switched off condition! Risk of electric shock!