
Multi-Function Control ETMFC610
http://www.entecene.co.kr
329
EN
HANCED
TEC
HNOLOGY
10.1.3.5. Over Voltage
Move to
“MAINTENANCE / COUNT / PQM / OVER VOLTAGE”
to confirm over voltage
count.
MAINTENANCE / COUNT / PQM / OVER VOLTAGE
Number of over-voltage detection is displayed. This COUNT menu
consists 2 pages and use [▼][▲] button to move into sub-menu.
UNDER VOLT-VS (1/2)
Total number of over -voltage detection at source side and number
of over -voltage per phase are displayed.
UNDER VOLT-VL (2/2)
Total number of over -voltage detection at load side and number of
over -voltage per phase are displayed.
10.1.3.6. Under Frequency
Move to
“MAINTENANCE / COUNT / PQM / UNDER FREQUENCY”
to confirm under
frequency count.
MAINTENANCE / COUNT / PQM / UNDER FRQUENCY
Number of underfrequency detection is displayed.
10.1.3.7. Unbalance
Move to
“MAINTENANCE / COUNT / PQM / UNBALANCE”
to confirm unbalance count.
MAINTENANCE / COUNT / PQM / UNBALANCE
Number of current unbalance detection, source side voltage unbalance
detection and load side voltage unbalance are displayed.
[UNDER FREQUENCY]
COUNT : 0
[UNBALANCE]
CURRENT : 0
VOLT-SOURCE: 0
VOLT-LOAD : 0