![Endress+Hauser SpectraSensors OXY5500 Operating Instruction Download Page 19](http://html1.mh-extra.com/html/endress-hauser/spectrasensors-oxy5500/spectrasensors-oxy5500_operating-instruction_2407533019.webp)
Hauser
3
–
1
3 - I
NSTALLATION
This section describes the processes used to install and setup your OXY5500
analyzer. Once the analyzer arrives, fully examine the contents before installing
the unit.
Shipping Box Contents
The contents of the crates should include:
•
The Hauser OXY5500 analyzer
•
Optional Sample Conditioning System (SCS), if applicable
•
A USB flash drive or CD, which includes this manual and other system
manuals, calibration certificate and software. Refer to
Provided with the OXY5500 Analyzer”
4.
•
One USB cable (for Service purposes)
If any of these contents are missing, refer to
19.
Inspecting the Analyzer
Unpack and place the unit on a flat surface. Carefully inspect all enclosures for
dents, dings, or general damage. Inspect the supply and return connections for
damage, such as bent tubing. Report any damage to the carrier.
Each analyzer is custom configured with various accessories and options. If
there is any discrepancy with your order, please contact your local sales
channel. Refer to
19.
Hauser Class I Division 2 analyzers use a non-incendive
protection method and Zone 2 uses a non-arcing protection method; as
such, all portions of the local electrical installation codes apply. The
maximum allowed inductance to resistance ratio (L/R ratio) for the field
wiring interface must be less than 25 μH/Ω.
The safety of the analyzer is the responsibility of the installer and
the organization he/she represents.
Avoid jolting the instrument by dropping it or banging it against a
hard surface.
Summary of Contents for SpectraSensors OXY5500
Page 145: ......