ASP station 2000
6 Commissioning
Hauser
77
6
Commissioning
6.1
Function check
Function check
If you can answer the following questions with YES, then you can commission the device
(see Section 6.2 “Switching on the measuring device”). If the answer is NO, then please
refer to the appropriate sections:
Switching on the
measuring device
6.2
Switching on the measuring device
When you connect the power supply, the display lights up and signals “UNIT OFF”.
When you press the operating key beneath the “ON” field, the message “UNIT ON”
appears. The device is operational.
General
Section reference
Is the power supply connected?
Is the sampling hose correctly laid to the sampling point?
Is the sampling hose correctly connected to the unit?
When connecting a digital input signal, digital output signal and/or
analogue input signal
Section reference
Is the signalling connector correctly wired and connected to the terminal
board?