Emerson Process Management GmbH & Co. OHG
3-1
X-STREAM XE
Short Form Manual
HASXEE-SFM-HS
05/2017
3
Startup
Chapter 3
Startup
Once the unit has been unpacked and in
-
stalled, we recommend to first check the
settings, and if necessary adjust them to the
user’s needs. e.g:
•
What hardware is installed?
•
Is the unit configured to your needs
(alarms, inputs, outputs, etc.)
3.1 Introduction
In order for the information in this chapter
to be of any relevance, the unit must have
been installed according to the instructions
in chapter 4.
The following pages describe how to perform
a leak test, navigate through the menus and
what is to be observed when configuring the
unit. For the first
startup after installation,
follow the step-by-step instructions for navi
-
gating the menus, allowing you to familiarise
yourself with the unit and its software, and if
necessary adjust the settings to your needs.
OPERATION AT LOW TEMPERATURES
When operating an instrument at temperatures below 0 °C (32 °F), do NOT
apply gas nor operate the internal pump before the warmup time has elapsed!
Violation may result in condensation inside the gas paths or damaged pump
diaphragm!